PT.MALMASS MITRA TEKNIK PROJECT

DEPATI AMIR AIRPORT – PANGKAL PINANG

Location: Pangkal Pinang – Bangka Belitung, Sumatera

PROJECT DATA:
Owner: PT. ANGKASA PURA II (Persero)
Architect: PT. Wiratman & Associates
Building Area: ± 21.000 m²
Total Building: 1 Tower
Total Floor: 2 Storey
Function Building: Airport (Departure/Arrival Terminal)
Year: 2010

MEP SYSTEM:
ACMV System: AC Split Duct type, Ducting, AC Split Wall Mounted system and Mechanical Ventilation System

Plumbing System:
- Clean Water, Waste Water, Ventilation and Rain Water
(Hydraulic system)
- GWT cap.240 m³ (Source; PDAM and 2 Unit Deepwell),
- STP cap.60 m³/day, Aeration system and Recycling water 4 m³/hour

Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 165 m’
- Electrical Characteristicts; 380 Volt, 3 Ph, 50 Hz

Lift/Elevator/Escalator:
- 3 Unit Lift Passengers Roomless, 17 Persons/1500kg, 60 mpm cover glass type, 4 Unit Escalators (inclination 35°)

Electrical System:
- Electrical Load; PLN 1.385 kVA (Source; PLN & Genset)
- Transformers Oil type, 1 x 1.600 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set, 2 x 800 kVA Synchronized,
- Prime power type - Engine Management System (EMS),
- Uninterupted Power Supply (UPS) 40 kVA + 10 kVA, 380 V, 3 Ph, 50 Hz

Lighting Control System :
Grounding System: Common grounding, maximal 2 Ohm (Ω)
Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Electronica of Airport :
Telecommunication System: PABX, 100 Lines Direct – 250 Extention, to PT. Telkom
Fire Alarm System: Fully Addressable system, 2 Loops – 450 points
Sound System: Public Address System and Back Ground Music System
Information Display: Field Information Display System (FIDS), Master Clock System (MCS)
Security System: CCTV System, MATV System and X-Ray System,
Ancillary: Local Area Network (LAN), Building Control Management System (BCMS) and Baggage Handling System (BHS), Domestic and International.