image
PT.MALMASS MITRA TEKNIK PROJECT

CERVINO VILLAGE

Location: Jalan Tebet Barat Dalam III.A/No.1, South Jakarta

PROJECT DATA:
Owner: PT. PAKKODIAN
Architect: PT. KBA Architect
Site Area: ± 7.350 m²
Building Area: 40.200 m²
Total Building: 1 Tower
Total Floor: 25 Storey + 2 Basement
Function Building: Apartment
Year: 2008

MEP SYSTEM:
ACMV System: AC Split Type Wall Mounted, Split Duct type and Mechanical and Ventilation System

Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.600 m³ (Source; PDAM & Deepwell),
- Top Reservoir cap.2 x 35 m³, Square type
- STP cap.350 m³/day, Aeration system

Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 165 m’
- Electrical Characteristicts; 380 Volt, 3 Ph, 50 Hz

Lift/Elevator: 6 Unit Lift Passangers + 1 Unit Lift Service

Electrical System:
- Electrical Load; PLN 1.385 kVA (Source; PLN & Genset),
- Transformers Oil type, 1 x 1.250 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set, 2 x 600 kVA Synchronized, Prime power type

Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: PABX, 521 Direct Lines – 1500 Extention Outlets, to PT.Telkom
Fire Alarm System: Semi Addressable System, 2 Loops - 450 points
MATV System: Cable TV System
Sound System: Public Address, Paging System and Car Call System
Security System: Cable TV System, Access Card and Intercom System