image
PT.MALMASS MITRA TEKNIK PROJECT
JUBILE SCHOOL

Location: Makassar – South Sulawesi
PROJECT DATA:
Owner: YAYASAN JUBILE SCHOOL
Architect: Komunitas Hatmakanwetan
Building Area: ± 12.000 m²
Total Building: 1 Tower
Total Floor: 6 Storey
Function Building: School building
Year: 2009

MEP SYSTEM:
ACMV System:
- AC Split Duct type, AC Split Wall Mounted and
- Mechanical and Ventilation System

Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.450 m³ (Source; PDAM & Deepwell)
- STP cap.380 m³/day, Aeration system

Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) cap.1.000 us gpm, head 165 m’
- Electrical Characteristics; 380 Volt, 3 Ph, 50 Hz

Lift/Elevator System: 3 Unit Lift Passengers + 1 Unit Lift Service

Electrical System:
- Electrical Load; PLN 835 kVA (Souerce; PLN & Genset)
- Transformers Oil type, 1 x 1.000 kVA, 20 kV – 380 Volt
- Diesel Genset, 1 x 800 kVA, Prime power

Lightning System: Conventional system
Telecommunication System: PABX, 50 Direct Lines - 250 Extention, to PT. Telkom
Fire Alarm System: Semi Addressable System, 1 Loops – 225 points
Sound System: Public and Car Call system
Security System: CCTV system
Ancillary: Building Automation System (BAS)