PT.MALMASS MITRA TEKNIK PROJECT
GREEN BAY PLUIT, MUARA KARANG
Location: Pluit – North Jakarta
PROJECT DATA:
Owner: PT. KENCANA UNGGUL SUKSES
Architect: PT. Airmas Asri
Total Area: ± 8,3 Ha
Total Building Area: GFA Construction = ± 497.425,55 m²
Total Building: 8 Towers
Total Floor: 32 Storey
Function Building: Commercial Area (Mall), Apartment
Year: 2009
MEP SYSTEM:
- ACMV System: Central Air Cooled Chiller, AC Split Wall Mounted, Split Duct and Mechanical Ventilation System
Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.1.400 m³ (Source; PDAM & Deepwell),
- Top Reservoir cap.4 x 80 m³, Modular type
- STP cap.1.200 m³/day, Aeration system and Recycling Water
Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) cap.1.250 us gpm, head 175 m’
- Electrical Characteristicts 380 Volt, 3 Ph, 50 Hz
Lift/Elevator System:
- 12 Unit Lift Passengers, 15 persons/1500kg, 110 mpm
- 4 Unit Lift Service, 1500kg, 90 mpm
- 14 Unit Escalators (inclination 35°)
Electrical System:
- Electrical Load; PLN 30 MVA, TM 20 kV (Source; PLN & Genset)
- Transformers Oil type, 6 x 2.000 kVA, TM 20 kV – 380 Volt and
- Transformers Oil type, 2 x 1.600 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set, 4 x 850 kVA Synchronized, Prime power type
Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: Direct Lines to PT. Telkom
Fire Alarm System: Semi Addressable system, 12 Loops – 2.700 points
Sound System: Public Address and Evacuation System
Security System: CCTV System and MATV System
Ancillary: Building Automation System (BAS)