PT.MALMASS MITRA TEKNIK PROJECT
GEDUNG ARTAJASA
Location : BSD City Serpong - Tangerang
Project Data :
Owner : PT. Artajasa Pembayaran Elektronis
Architect : PT. Ateliar 6 Arsitek
Site Area : 4885 m2
Building Area : 8.045 m2
Total Building : 1 Tower
Total Floor : 6 Lt, 2 basement
Function Building : Office & Data Center
Year : 2011
MEP System :
ACMV System : VRV System
Plumbing System :
-Clean Water,Waste Water, Ventilation and Rain Water. Etc
-Ground Water Tank (GWT) cap. 185 m3 (Source, PDAM and Deep Well)
-Top Reservoir cap. 16 m3
-STP cap. 45 m3/day, Aeration System
Fire Fighting System :
-Fire Hydrant, Sprinkler System and Fire Extinguisher
-Electric Hydrant Pump (EHP) 750 us gpm, head 125 m
-Electrical Characteristic : 380 Volt, 3 Ph, 50 Hz.
-Lift / Elevator : 3 unit Passengers Lift, 1 unit service lift
Electrical System :
-Electrical Load : PLN 1.759 kVA (Source : PLN & Genset)
-Trafo Oil type : 1 x 1.250 kVA, Dry type : 2 x 1250
-Diesel Generator Set, 2 x 1000 kVA Synchronized, Prime Power.
Lightning System : Conventional System
Telecommunication System : PABX-300 line outlets
Fire Alarm System : Semi Addressable System, 1 loops – 400 points
Sound System : Back Ground Music (BGM), Paging Speakers
Security System : CCTV System
Ancillary : Building Automation System (BAS)