PT.MALMASS MITRA TEKNIK PROJECT
ASTRA BANDUNG
Location: Jalan Soekarno Hatta – Bandung (Pematangan Lahan), West Java
PROJECT DATA:
Owner: PT. ASTRA INTERNATIONAL
Architect: Aksis Architect in Association with Bhirawa Architect
Total Building area: ± 33.000 m²
Total Floor: 3 Storey
Function Building: Office and Show room Daihatsu, Izuzu, Nissan, Rotunda
Year: 2009
MEP SYSTEM:
ACMV System: AC Split Duct, AC Split Wall Mounted and Mechanical Ventilation
Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.350 m³ (Source; PDAM and Deepwell),
- STP cap.140 m³/day, Aeration system
Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) 750 us gpm, head 135 m’
- Electrical Characteristics; 380 Volt, 3 Ph, 50 Hz
Lift/Elevator System: 3 Unit Lift Passengers, 9 persons/1000 kg, 45 mpm
Electrical System:
- Electrical Load; PLN 3.465 kVA, TM 20 kV
- Transformers Oil type, 2 x 1.600 kVA, 20 kV – 380 Volt
- Diesel Generator Set, 2 x 1000 kVA Synchronized, Prime power
Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: PABX, 50 Direct Lines - 150 Extention, to PT. Telkom
Fire Alarm System: Semi Addressable System, 1 Loop – 225 points
Sound System: Paging and Car Call system
Security System: CCTV system