PT.MALMASS MITRA TEKNIK PROJECT

KBK FK UKI

Location: Campus Christian University of Indonesia, Cililitan – East Jakarta

PROJECT DATA:
Owner: Yayasan UKI
Architect: PT. Cakra Manggilingan
Site are: ± 1.400 m²
Building Area: 8.000 m²
Total Building: 1 Tower
Total Floor: 11 Storey
Function Building: Fakultas Kedokteran
Year: 2009

MEP SYSTEM:
ACMV System: AC Split Duct, AC Split Wall Mounted system and Mechanical Ventilation system

Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.250 m³ (Source; PDAM & Deepwell),
- STP cap.80 m³/day, Aeration system

Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 150 m’
- Electrical Characteristics; 380 Volt, 3 Ph, 50 Hz

Lift/Elevator System:
- 2 Unit Lift Passengers, 15 persons/1000 kg, 90 mpm
- 1 Unit Lift Service, 9 persons/1000 kg, 60mpm.

Electrical System:
- Electrical Load; PLN 1.110 kVA (Source; PLN & Genset),
- Transformers Oil type, 1 x 1.000 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set; 1 x 800 kVA, Prime power

Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: PABX, 100 Direct Lines – 1000 Extention, to PT. Telkom
Fire Alarm System: Semi Addressable System, 1 Loops - 225 points
Sound System: Paging System and Car Call System
Security System: CCTV System