POWER PLANT PROJECT

image 3

Bontang Mining Coal

Pekerjaan Perencanaan Transmisi 70 kV dan Gardu Induk 70/20 kV

Location : Kalimantan Timur

Owner : PT. Multikom Intermitra

Work Area : E/M & Sipil

Year : 2007

 

image 3

Pekerjaan Pembuatan Tender Document Pembangunan IBT ke-3 500/150 kV 500 MVA Digitet Gandul dan 2 Line Bay ke arah Serpong S/S

Location : Jakarta

Owner : PT. PLN (Persero) P3B JB Region Jakarta dan Banten

Work Area : Tender Document

Year : 2007

 

Project List:

image 1

image 3

Detail Design Engineering Gas Insulated Switchgear (GIS) Cawang 150 kV, 10 Bay, 4 Line Bay, 2 IBT Bay, 1 Coupler Bay, 3 Trafo Bay

Location : Cawang, Jakarta Timur

Owner : PT. Meta Epsi Engineering

Work Area : E/M & Sipil

Year : 1997

image 3

Detail Design Engineering Gas Insulated Switchgear (GIS) Mangga Besar 150 kV, Building, 8 Bay, 4 UGC, 1 Coupler Bay, 3 Trafo Bay

Location : Jl. Mangga Besar, Jakarta

Owner : PT. Meta Epsi Engineering

Work Area : E/M & Sipil

Year : 1996