PT.MALMASS MITRA TEKNIK PROJECT
WOLTER MONGINSIDI AIRPORT - KENDARI
Location: Kendari – Sulawesi Tenggara
PROJECT DATA:
Owner: Dinas inasinas Perhubungan Sulawesi Tenggara
PT.Malmassa Mitra Teknik Associated to PT. WASKITA KARYA (Persero)
Architect: PT. Wiratman & Associates
Site area: 11 Ha
Building Area: ± 16.000 m²
Total Building: 1 Tower
Total Floor: 2 Storey
Function Building: Airport (Departure/Arrival Terminal)
Year: 2005
MEP SYSTEM:
ACMV System: AC Split Floor Standing, Split Wall Mounted system and Mechanical Ventilation System
Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
(Hydraulic system)
- GWT cap.250 m³ (Source; PDAM & Deepwell), STP cap.60 m³, Aeration system
Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 125 m’
- Electrical Characteristicts; 380 Volt, 3 Ph, 50 Hz
Lift/Elevator/Escalator:
- 3 Unit Lift Passengers Roomless, 15 persons/1500kg, 60 mpm
- 4 Unit Escalators (inclination 35°)
Electrical System:
- Electrical Load; PLN 1.455 kVA (Source; PLN & Genset)
- Transformers Oil type, 1 x 1.600 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set, 2 x 500 kVA, Synchronized, Prime power type
- Uninterupted Power Supply (UPS) 10 kVA, 380 Volt, 3 Ph, 50 Hz
- Lighting Control System
Grounding System: Common grounding, maximal 2 Ohm (Ω)
Lightning System: Conventional system
Electronica of Airport:
Telecommunication System: PABX, 100 Lines Direct – 500 Extention, to PT. Telkom
Fire Alarm System: Conventional system
Sound System: Public Address System and Back Ground Music,
Information Display: Field Information Display System (FIDS), Master Clock System (MCS)
Security System: CCTV System, MATV System and X-Ray System
Ancillary: Local Area Network (LAN), Building Control Management System (BCMS) and Baggage Handling System (BHS), Domestic