PT.MALMASS MITRA TEKNIK PROJECT

THE FOUR “R” HOTEL

Location: Jalan Rancabentang No.30-32 - Bandung, West Java
PROJECT DATA:
Owner: THE FOUR ‘R’ HOTEL
Architect: PT. Wiratman & Associates
Site Area: ± 7.756 m2
Building Area: ± 12.453,59 m2
Total Building: 1 Tower
Total Floor: 12 Storey
Function Building: Hotel (76 Rooms)
Year: 2005

MEP SYSTEM:
- ACMV System: AC Air Cooled Split Ceiling Concealed type and
Mechanical Ventilation System

Plumbing System:
- GWT cap.233 m3 (Source; PDAM and Deep Well),
- STP cap.40 m³/day (Commercial Area) and
- 60 m³/day (Hotel), Aeration system

Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 165 m’
- Electrical Characteristict; 380 Volt, 3 Ph, 50 Hz

Lift/Elevator:
- 2 Unit Lift Passengers, 9 persons/1000kg, 90 mpm
- 1 Unit Lift Service, 1000kg, 60 mpm

Electrical System:
- Electrical Load; PLN 1.110 kVA (Source; PLN & Genset),
- Transformers Oil type,1 x 1.000 kVA, 20 kV – 380 Volt
- Diesel Generator Set, 2 x 500 kVA Synchronized, Prime power type

Lightning System: Non Conventional, Early Streamer Emission
-Electrostatic type
Telecommunication System: PABX, 120 Direct Lines – 1500
Extention Outlets, to PT. Telkom
Fire Alarm System: Semi Addressable System, 2 Loops – 450
points
MATV System: Cable TV System
Sound System: Back Ground Music (BGM), Paging Speakers, Car
Call System
Security System: CCTV System