PT.MALMASS MITRA TEKNIK PROJECT
MALL KKCC
Location: Surabaya – East Java
PROJECT DATA:
Owner: PT. Pembangunan Perumahan (Persero) Cabab. III
Architect: PT. Garmath Design Associated
Total Building area: ± 85.100 m²
Total Floor: 5 Storey
Function Building: Housing, Dormitory, Rehabilitasi, Sport building
Year: 2006
MEP SYSTEM:
- ACMV System: AC Split Duct System, Ducting and AC Split Wall Mounted Mechanical Ventilation System
Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.375 m³ (Source; PDAM and Deepwell),
- STP cap.200 m³/day, Aeration system
Fire Fighting System:
- Hydrant and Sprinkler system
- Electric Hydrant Pump (EHP) 500 us gpm, head 150 m’
- Electrical Characteristict; 380 Volt, 3 Ph, 50 Hz
Lift/Elevator System:
- 2 Unit Lift Passengers, 9 persons/1000 kg, 60 mpm
- 1 Unit Lift Service, 1000 kg, 60 mpm
Electrical System:
- Electrical Load; PLN 5.540 kVA (Source; PLN & Genset)
- Transformers Oil type, 2 x 2.000 kVA, TM 20 kV – 380 Volt
- Transformers Oil type, 1 x 1.000 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set; 2 x 2.000 kVA, Synchronized system, Prime power type
Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: PABX, 200 Direct Lines – 1500 Extention, to PT. Telkom
Fire Alarm System: Semi Addressable system, 2 Loopss – 450 points
Sound System: Public Address System and Evacuation System
Security System: CCTV System