PT.MALMASS MITRA TEKNIK PROJECT
ASTON BATAM (CONVENTION, HOTEL AND RESIDENCE)
Location: BATAM (Kepulauan Riau)
PROJECT DATA:
Owner: PT. GRAND UWAY DEVELOPMENT
Architect: PT. Art Design Indonesia
Site Area: ± 3.656 m², 1.620 m² and 1.300 m²
Building Area:
- Convention Hall = 10.000 m²,
- Hotel = 19.300 m²,
- Residence = 21.000 m²
Total Building: ± 8.500 m²
Total Floor: 11 Storey (Hotel), 16 Storey (Residence)
Function Building: Convention hall, Hotel and Apartment
Year: 2008
MEP SYSTEM:
- ACMV System: AC Split Wall Mounted, AC Split Duct System and Mechanical Ventilation System
Plumbing System:
- GWT cap.400 m³, (Source; PDAM & Deepwell)
- Top Reservoir cap.60 m³, Modular type
- STP cap.200 m³/day, Aeration system
Fire Fighting System:
- Fire Hydrant & Sprinkler System
Lift/Elevator system:
- 3 Unit Lift Passengers, 15 persons/1500kg, 90 mpm
- 1 Unit Lift Service, 1500kg, 60 mpm (2 Unit Roomless)
Electrical System:
- Electrical Load; PLN 1.808 kVA (Source; PLN & Genset),
- Transformers Oil type, 1 x 1.600 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set, 1 x 800 kVA Stand-by power
Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: PABX, 1.400 Direct Lines outlets to PT. Telkom
Fire Alarm System: Fully Addressable System, 6 Loops – 1.350 points
MATV System: Cable TV System
Sound System: Public Address, Evacuation System and Back Ground Music
Security System: CCTV System and Access Card System
Ancillary: Building Automation System (BAS).