PT.MALMASS MITRA TEKNIK PROJECT
BNN
Location: Jalan Raya Bogor – Lido, West Java
PROJECT DATA:
Owner: BNN
Architect: PT. Arservo
Site area: ± 5.345 m²
Total Building: 12 Tower
Function Building: Housing, Dormitory, Rehabilitasi, Sport Building
Year: 2008
MEP SYSTEM:
ACMV: AC Split Duct and Mechanical Ventilation System
Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.250 m³, (Source; PDAM & Deepwell)
- STP cap.80 m³/day, Aeration system
Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP), 1.000 us gpm, head 140 m’
- Electrical Characteristicts; 380 Volt, 3 Ph, 50 Hz
Lift/Elevator System:
- 2 Unit Lift Passengers, 15 persons/1500kg, 90 mpm
- 1 Unit Lift Service, 1500kg, 60 mpm
Electrical System:
- Electrical Load; PLN 690 kVA (Source; PLN & Genset)
- Transformers Oil type, 1 x 630 kVA, TM 20 kV – 380 Volt
Lightning System: Conventional system
Telecommunication System: Direct line to PT. Telkom
Fire Alarm System: Semi Addressable System, 4 Loops – 900 points
Sound System: Public Address and Evacuation System
Security System: CCTV System