image
PT.MALMASS MITRA TEKNIK PROJECT
MALL & APARTMENT GRAND CIPULIR

Location: Cipulir – Jakarta

PROJECT DATA:
Owner: PT. PANDHEGA SHORA
Architect: PT. Airmas Asri
Building Area: ± 160.000 m²
Total Building: 1 Tower
Total Floor: 9 Storey (Mall), 12 Storey (Apartment)
Function Building: Commercial Area (Mall) and Apartment
Year: 2009

MEP SYSTEM:
ACMV System: Central Water Cooled Chiller System and Mechanical Ventilation System

Plumbing System:
- Clean water, Waste water, Ventilation and Rain water, etc
- GWT cap.870 m³ (Source; PDAM & Deepwell)
- Top Reservoir, 2 x 80 m³, Modular type
- STP cap.550 m³/day, Aeration system

Fire Fighting System:
- Hydrant and Sprinkler System
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 125 m’
- Electrical Characteristict; 380 Volt, 3 Ph, 50 Hz

Lift/Elevator System:
- 6 Unit Lift Passengers, 17 Persons/1500kg, 90 mpm
- 6 Unit Escalators (inclination 35°),
- 4 Unit Travelators (inclination 12°)

Electrical System:
- Electrical Load; PLN 6.930 kVA (Source; PLN & Genset), Transformers Oil type, 2 x 2.000 kVA and 1 x 1.600 kVA, TM 20 kV – 380 Volt
- Diesel Generator Set, 2 x 2.000 kVA Synchronized, Prime power type

Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: Direct Lines – PT. Telkom
Fire Alarm System: Semi Addressable system, 18 Loops – 4.050 points
Sound System: Public Address and Evacuation System
Security System: MATV System and CCTV System