PT.MALMASS MITRA TEKNIK PROJECT
Alamanda Tower
Location : Jl. TB. Simatupang
PROJECT DATA:
Owner: PT. Karyadeka Graha Lestari
Architect: Planning & Development Workshop (PT. PDW)
Building Area: 49.420 m2
Total Building: 1 Tower (Kantor dan Parkir)
Total Floor: 30 Lantai Kantor + 3 Lantai Basement
Function Building: Office dan Parkir
Year: 2010
MEP SYSTEM
ACMV System: Central Chiller Water Cooled dan Ventilasi Mekanik Plumbing System:
- Clean Water System and waste water, STP 120 m3 dan Recycling 100 m3, GWT 530 m3
- Top Reservoir 50 m3 and Recycling 50 m3
Fire Fighting System:
- Fire Hydrant, Sprinkler System and Fire Exthinguisher
- Electric Hydrant Pump (EHP) 750 us gpm, head 200 m’
- Electrical Characteristic; 380 Volt, 3 Ph, 50 Hz
Lift / Elevator: 8 Unit Lift Passenger and 1 Unit Lift Service
Electrical System:
- PLN Capasitor 1905 kVA TM
- Transformer 2 x 1600 kVA, 20 kV – 380 Volt
- Diesel 2 x 1350 kVA + 1 x 1000 kVA, Synchronized, Prime Power
Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: Telkom 200 / 2000 Ext.
Fire Alarm System: Semi Addressable System, 4 loop – 900 points
Sound System: Back Ground Music (BGM), Public Address and Evacuation
Security System: CCTV System
Ancillary: Building Automation System (BAS)